| Concrete was poured into the walkways for the front and side entrances and the inside ramp on September 10th. |
![]() |
At left, the construction crew saved the stone below this window so it could
be used at the current side entrance when it becomes a window.
|
| Standing at left, Michael awaits his opportunity to set his name in concrete (after they turn their backs of course!). ![]() |
We see the new front ramp in place. These McCallie Avenue
front doors will be available should a wider access be needed.![]() |